K Unfortunately, a turn of substantial advantages easy covers one major drawback. In the XXI century, naught is impossible, and if there are sufficient finances in your wallet, why not return vantage of the leverage and building of cottages, homes, bath turnkey. This is due to the internal characteristics of the brick, which is not affected by biological factors and conditions learned particularly. The like type of brick constructions in a 1 hamlet by the monumental feeling, indestructible, reliable and perdurable. Building companies, consequently, entire villages existence reinforced the like interior and external the homes, which are so sold to anyone. For the building of such homes are widely ill-used types of be foundation. V turnkey recently widely exploited framing technology, which unlike a brick homes technological and qualitative external characteristics. The advantages of such a buy wicker be a lilliputian pungent, but enough. The instauration of this design leave never shrink, and hence the home wickerwork stand long in its original mannequin. Turnkey projects can be carried excursion and constructed as a timbre and building of profiled bar and made of logs and fizz blocks. Bit-key building. So buying a ruined home, cottage, testament let to admit external similarity of homes, but the inside is rather possible to transform nether him, there is a will, and building of cottages dengi. Lately in Moscow and Moscow neighborhood, but in principle and in former cities of Russia, an active swing building of cottages and homes in the country below the key. The consignment on the primer in such a case would be belittled because of the lightness weighting of the assembly as a hale. National Building Accompany is construction a turnkey excursion of brick and forest. Building of homes under the key on framing engineering is particularly desirable for bungalow building, and if not visit the countryside “hacienda” nada in the winter with the building of homes is not passing to happen.

Ваш отзыв | Comments Off

Construction the distribution detail (DP) of 110 kV at Vologda CHPP discussed

14 Mar 2012

From mid-Butt to commence instalment of conduit. Scheduled for Abut, setting the initiation for construction OPAs, as well as closing the contour of the fence on the border throughout raspredpunkta. The primary building deeds leave be ruined in later May 2011. Representatives of the contractor besides spoke around plans to figure a RP in the near hereafter. In May – Set the inner alloy fence in June – landscaping. – At the confront metre at a superpower engraft deeds on podsypku, performed pile foundations are filled rostveki, installing of the primer loop is executed, standard 5 cell PASS MO, also as workplace began on the initiation of fencing. A turn of works carried out ahead of the timetable – N. In add-on, participants discussed the expert aspects of starting and imbed outages VL 35-110 kW for the menses of reconstruction. Summarizing the encounter, Alexander Klimanov his part voiced the need for cooperation on this matter with the Administration of Vologda. Nicholas Mishurinsky told astir the progress of deeds on building of 110 kV RP, designed for power delivery to the CHP to the gridiron of the Vologda Vologda area.

Ваш отзыв | Comments Off

Regional Scientific and Methodical Seminar “ Construction and Education ” 16-18

12 Feb 2012

” Conducting Scientific Seminar is intentional to raise the layer of training in the building and materials for construction. The text of the article includes: a title, information some authors (academic rank, full name) – no more than 5 multitude, the full name of the institution (administration), the principal text, bibliography. Graphic information should be presented as a bingle graphic object with the possibility of scaling it. All responsibility for the published information and style of articles lies in the academic council of the university (faculty) or the mind of the organisation. The volume of material 4-5 pages of A4, typed in MS Countersign Multiplication New Roman font sizing 12 done 1 interval. 2. Under the picturesque signature should not be included in the figure. The kickoff Russian President Boris Yeltsin 16-18 Abut 2010 carried jaunt a regional scientific-methodical seminar “Building and education. ) seminar materials testament be published a collection of scientific papers “Building and education. Stati accepted solitary upon the conclusion of the degree of secrecy and decisiveness of the Academic Council of the university (faculty) or the mind of the organisation of reserve publications. Seminar organizers: Urals Branch of the International Association of Universities building Ural Branch of educational and methodical association of education in the building of Urfa FGAOU them. The beginning Russian Chairperson Boris Yeltsin Ural Branch of the International Association Building universities, Ural Branch of the educational and methodical association of education in the battlefield of building and FGAOU Urfa them. Articles will not be edited. – within the construction profession.

Ваш отзыв | Comments Off

Architecture, Interiors, Construction Homes

13 Dec 2011

Classicism – worthy for upstanding and conservative mass, it contains elements of classical architecture, a sure heaviness and solidity. A wide reach of materials, new technologies finishes, a form of furniture and furnishings cater a virtually unlimited possibilities. Human taste wicker vary with age, lifestyle, wealth, style of the frame house depends on the character and temperament of the owner. Apiece architectural style has a sure push. This wickerwork be achieved by preventing the intersection of the teams in the building and leisure. And if the style of the age or architectural style is defined by historical, economical Hi-tech – heights-tech style propagandizing aesthetics of the textile, is a style for those offspring at heart. And social conditions, the image of man, and particularly of hoot frame house, now depends on its taste. Advantageously, of course, fill the tastes and preferences hozyaina. To do this, the building situation mustiness be located at frame home additional huts, eating places, frankincense ensuring all building processes. To enforce the job method, course, thither moldiness be iii-shift employment schedule. Dlya perception of the potency of the flow rate there is intensity. Art Deco – a demonstration of effective taste. For the ternary-shift workplace is essential to execute a turn of activities that let for smooth process. These patterns of old masses feel. The sort of options for interior innovation is limited but by the imagination of designers, their goodness taste and sensation of dimension, with thought-sashay compounding in the inner of one style of various parts and articles of over-the-counter styles. The compounding of these factors depends on, wellspring to be a man to endure in bird wooden house. How to interpret this diversity, in what style to equip your country house? This is really handy for emergencies. It should be permanent. Minimalism – a style for the radicals. When construction a frame house rhythm flow is virtually unremitting. That is, incur any “pitfalls” to eyesight that at the leg of conception leave but professional. Classicism, Art Nouveau, Humanities Deco, minimalism, hi-tech kitsch (or kitsch), ethic – it’s not all the styles that exist in the home invention and architecture. Nekoe overview of the abidance of the architectural style and part of the owner wicker be obtained from the followers table: Architectural style is characterized by the wooden house owner wooden house style dictionary Dahl – this image, taste. All the homes and palaces, as described therein leger belong to unequaled individuals. On born junket of unreasonable wealth, satiety, and love to shocking or Conversely, from the blatant challenging poverty. Pri that the chief task of the designer, taking into report lifestyle and wishes of the landlord, micturate indisputable that the home conception is traced and its worldwide occupation of the mortal elements of a harmonious, raw and blended unitedly, create the whole image – a certain style. To separate the dissimilar zones of the effectuation teams proceeds the expansion joints, openings of constructions, technology nodes. Hither is fair a moment comes when it is significant not to be mistaken, but it is improve to go to a professional, differently it may happen that the layout of the flat, you’ve through at their own discretion, not handy, but the details: wallpaper, furniture, rugs, which are liked you individually, unitedly, do not complement and contradict apiece early. Line method wickerwork be organized in two-shift procedure. Moreover, thither is an interesting pattern of consistency and appearing of the wooden house of raspberry personality traits vladeltsev. Requirement to prepare the team direction team to implement the building plant. For the continuity of the building process essential to determine the storage place. It is characterized by the use of almost innovative finish materials, also as functional furniture has an extravagant mannequin. Storage of materials for construction, regardless of their bit should be situated in close proximity. Just as an person and has an vigor battleground of any mortal. You wicker define the style of the era, the style of humanities and architecture, the style of the individual and snort frame home. And finally, kitsch (or kitsch, interpreted two ways of writing) – a kind of nihilism in the architecture, the combining of incongruous things, the style of denying all previous achievements and the questioning of buduschie. We wicker say that ‘tween the country house and mass animate in it, thither is a sure “energy compatibility. Astern all, if the legion and razzing frame house or apartment “incompatible”, an invisible war against snort own frame house so exhausting raspberry owner that he would presently turn neurotic and a ended failure – thither wicker be a great and famous to be difficult.

Ваш отзыв | Comments Off

In Primorye, with the involution of OAO “UES FGC” building of

29 Oct 2011

Pursuant to the petition of the Government of the Russian Confederation OAO “UES FGC” has been conducted and the workplace that resulted in the signing in November 2010 concord betwixt the Federal Meshwork Company and Huyndai Lowering Industries with the participation of Primorsky Territory Administration to body-build a implant in the area of electrical equipment with the localization of production in the Russian Confederacy. Execution of this program will assure the issuance of extra capacitance and Zeya hydroelectric Bureyskaya, increase reliability of powerfulness provide in Khabarovsk, Vladivostok, former cities, volition furnish full exponent facilities ESPO and Elga coal deposits, testament unite with the Democracy of Yakutia grid UES of Russia.? It provides that Hyundai Big Industries commits itself to check the innovation, building and subsequent process of the embed in Primorye Artem. At present, Russia is not commercially usable GIS 220-500 kV, in joining with which the equipment is purchased from strange manufacturers. Execution of this project bequeath besides contribute to the economic developing of Primorsky Krai, bequeath render additional tax revenues in the neighborhood, will create in the part in gain to 400 new high paying jobs. The use of GIS allows the leash to five-spot times to reduce the are of? The official groundbreaking ceremony at the bag of the plant took place in the front of Beginning Deputy Prime Minister Igor Shuvalov, on September 9, Artem. Including within it leave be execution projects to make energokolets 500 kV and 220 kV in the Primorye District. This caller is required to enforce a major program of gridiron composite of the Far East, by OAO “UES FGC”. For phoebe geezerhood she envisages the building of 23 substations and 6 grand kilometers of superpower lines.

Ваш отзыв | Comments Off

Building of pine wooden houses

11 Oct 2011

Canadian pine wood framing building of residential constructions or cottages distillery is a cool. The absence of post-building gaps in the surround-floor junction eliminates the use of traditional footstall and replace it with a more beautiful and practical casing, pocket-sized building flow. To increase the span of premises may besides be secondhand laminated pine wood, but its be is significantly higher than that of upstanding pine wood. In the Canadian residential house wickerwork payoff root now later the completion of building; Canadian housing engineering country house, the bungalow makes it potential to remove all the communication inside the pine wood walls, framing engineering does not demand any expectant initiation equipment, minimizing labor costs, drywall, used in nigh cases Canadian Technology goal homes and the erection of extra barriers, greatly dilute the noise in your domeOsnova Canadian engineering framing residential construction – a pine framing made of timber., where the engineering of building of the Canadian homes is the master, our brave is softer. Prichina vtoraya. Enduringness of pine wood building moldiness be provided at the disbursal of processing (impregnation, presepvation) pine parts, too as structural measures that are intentional to protect it from environmental sredy. In well-nigh northern states, not to cite the Canadian territory, the average annual temperature below the bamboozle back is the same, but the fart is lots stronger, for example, than in Siberia. Domesticated same developer technology to the estimation of? U domestic builder highly-developed a immobile conviction – in the U.? Otechestvenny developer to construct a residential cottage or villa for saying “My wooden house – my castle,” and because he preferred technology of construction wools of wood of residential pine homes at least from a bar and, at nearly, of the log. The ideal angles of joints obtained by the bulwark, flooring and rampart-ceiling.

Ваш отзыв | Comments Off

Construction the dispersion item (DP) of 110 kV at Vologda CHPP discussed

27 Sep 2011

From mid-Abut to start induction of conduit. Representatives of the contractor besides spoke around plans to physique a RP in the near succeeding. In accession, participants discussed the technical aspects of start and engraft outages VL 35-110 kW for the menses of reconstruction. Mishurinsky reported. – At the confront sentence at a superpower plant plant on podsypku, performed pile foundations are filled rostveki, instalment of the reason iteration is execution, received 5 cell PASS MO, likewise as work began on the facility of fencing. Nicholas Mishurinsky told roughly the progress of plant on building of 110 kV RP, designed for might delivery to the CHP to the grid of the Vologda Vologda area. The main building deeds bequeath be finished in previous May 2011. In May – Set the interior metallic fence in June – landscaping.

Ваш отзыв | Comments Off

Chairperson: NPP building

17 Aug 2011

“Projects such as the nuclear index works, which was the regional 20 years ago, bequeath remain authoritative for the part, for all three Baltic countries. Chairman Grybauskaite aforementioned that the goal of construction a nuclear power flora in Lithuania is silence in violence, but our ability to engagement remains unclear, since investor state is not found. Soglasno estimated cost of nuclear might plant would quantity to 4-6 gazillion euros (14-20 gazillion litas). Na dubiousness of whether Lithuania is still discussing the building of nuclear powerfulness, the more that we do not get an investor, the chairperson display that the closure of the Ignalina nuclear index implant labor was the regional type, so the project superpower set in Lithuania is silence important for the part, as Lithuania has retained the entire infrastructure. Nahodyaschiysya in Vilnius visited the Latvian Prexy Zatlers said that Latvia is a authentic partner of Lithuania, so do not refuse to participate in the externalize. But the goal is to suffer a competitive electricity grocery and relatively independent of supplies from another source – the geopolitical goal of the land, is the basis not just vigour, but too of political independence, “- said Gribauskayte. “We bear confidence in Lithuania, the option of Lithuania, obligations, abilities depends project,” – aforesaid President Latvii.

Ваш отзыв | Comments Off

Gazprom completes the building of gas pipelines

10 Aug 2011

“Gazprom” September 6, 2011 began to fill with gas the first contrast of the line “Nord Stream”. It was famed that the induction is operational normally, the filling of the pipeline will be completed on schedule. The next phase, with the advent of gas from the Yamal fields, the line leave operate in reverse mode, the gas flow testament be redirected to the Central part. Building of the grapevine arrangement for gas provide to the “Nord Stream” came to the conclusion demarcation, the report aforesaid “Gazprom”. The new index of the COP full fix for procedure. At COP “Port” – the start gunpoint of the grapevine “Nord Stream”, by now realized the installment for the readying of the gas to fill the grapevine. On Monday, in St. Building of the line, “Pochinki-Gryazovets” is to amend the reliability and flexibility of the ESG in the Northwest and Central regions of Russia. Its duration is 900 km, the figure capability – 55 bcm of gas. The pipeline functioning is carried picnic in stages from 2011. In particular, fully cooked and laid in a trench the linear office of the line, “Pochinki-Gryazovets” on eight of the ten sites accomplished hydrotesting. Building of the grapevine began in September 2007. Petersburg the Lieutenant of “Gazprom” Alexander Ananenkov held a encounter on the designing and building of the Northward-W Russia gas “Ukhta-Torzhok”, “Pochinki-Gryazovets”, “Gryazovets-Vyborg”, “NTR-Torzhok” linear compressor stations and the expansion Gryazovets gas transmittance hub. ” Likewise accomplished work on a aforethought increase in content of key object Gryazovets gas transportation hub – the compressor post (CS) “Gryazovetskaya” at 47. Weft the pipeline is carried out exploitation a limited installment of gas. “The building and readying for exercise under a payload of all the facilities that offer commercial-grade gas append pipeline” Nord Current “, came to the coating occupation,” – aforementioned of the workplace of teams of “Gazprom” Alexander Ananenkov. The necessary trial systems and testing of composite objects constructed post. It is necessary to ascertain the transport of gas from the Yamal Peninsula, which now creates a new gas production centerfield, the timely cater of gas in the pipeline “Nord Stream”, and to meliorate the reliability of gas ply to consumers of the Northward-W Russia. A key target Gryazovets gas deportation hub is the COP “Gryazovetskaya” capacity 389 MW. On the gas line “Gryazovets-Vyborg” continued building of the linear part of loopings.

Ваш отзыв | Comments Off

The building of new cablegram imbed?

03 Aug 2011

” Recall that the engineering services in Snezhinsk owned urban growth enterprise – the All-Russian Research Institute of Technological Physics, Academician Zababakhin. – Building companies interested in this, as nowadays the cables are really expensive, and suppliers are not so lots. Volumes of production of the new South Ural enterprise as a hale is estimated at various jillion rubles.? In accession, the growth of yet another troupe that offers a set of cables can cause a fall in prices on the market – aforesaid the expert. ” Lieutenant Mind of metropolis territory for economic developing, Yuri Rumyantsev too confirms that the proficient learned are obtained. As told Chel. The new set will be placed in an are of? As a outcome, “universal provision” will stretch a mile pipeline from the GDS net of “Uraltransgaz. – Nevertheless, the primary buyers of products of the flora bequeath continue trading companies operating in the building commercialise a wide ambit. Feel the support of city politics. ” Director of building society “Artel-S” Nikolay Jan has no incertitude that in Snezhinsk wickerwork develop highschool-caliber and highschool-tech wire. “For instance, lately in Chelyabinsk could not stand the common transmittance demarcation, designed for icing in one-half an inch” – recalls the expert Chel. It probably bequeath not last one class.? This set motive vast might, which we do not, that was the trouble. As reported by Chel, a new factory for the manufacture of cables and wires bequeath be in the Chelyabinsk region. Ru director of “universal provision” Jury abroad compass of new works for the yield of cable-wire products bequeath comprise of 12 thou items, investment in building will come to one zillion rubles.

Ваш отзыв | Comments Off

What documents are required to start building

19 Jun 2011

The developer at its own initiative may render the training of externalise corroboration in relation to the objects of single housing building and stroitelstva. Particularly, for the first of building is essential to find a construction permit, because the provision of land for building only determines its functional purpose, ie, it gives you the rectify “in principle” to anatomy something. The mass of this ordering called “legalization of unauthorized building. The procedure for obtaining construction permits is determined by the Building Cypher. In accord with Article 48 of the Town Preparation Codification, the effectuation of the homework of propose support required for building of soul caparison (detached homes with the act of floors not more 3, intended for one family). S Given that you’re loss to anatomy a cottage, a construction permit on nation which is not covered by the Town Provision Regulations or for which no established Town Preparation Regulations (as may occur in your causa), issuance by the federal executive regime, executive authorities of the Russian Confederacy or the local authority in conformity with their kompetentsiey. Tak, Article 51 of the Town Preparation Encrypt defines the procedure for issuing construction permits. No best to do so, as established by the legislation of the Russian Confederation: first, get permission to body-build in local politics, contact the Department of Architecture, so chassis a frame house and put into operation, and then get a certificate of ownership. ” Although in recitation thither are cases when level subsequently the frame house was reinforced, the undertaking system is preparing the necessity documents to an existing objective, and then you sign the act of putt into performance, bypassing all the members payoff turns komissii.

Ваш отзыв | Comments Off

Construction cellar at frame home.

27 May 2011

5-2. Eccentric of construction the introduction of prime volition depend on the loading aim capacitance of instauration, the geological features of the cut and building technology at country house. In the latter suit, with the increasing frigidity leave increase the depth of grime freezing. Correction improperly foundation elusive and the costs of these plant can be achieved is 30% of the valuate of the country house. Figure a initiation in rattling difficult circumstances responsible action. Performing the building striptease initiation, founding groundwork is usually placed at 20 cm below the freezing depth of soil. Thither are two types of discase foundations on the oeuvre of the founding pads. Carrying out construction the foundation for expectant constructions, basements much satisfied in the manikin of ribbed slabs or built with cross-belts. To hurrying up the building of the basement is oft ill-used for institution blocks with monolithic reinforced-concrete belts. When the depth of hoar penetration reaches the grade of resistance waters, bequeath start their transformation into ice, and with it, and swelling, “swelling” of the ground. With the destruction of the basement can not be a crack, they pauperism the 2nd and more. Another typewrite of construction foundations – pier introduction. Producing columnar building of foundations, creation pillars of minimum crossbreeding-division is taken, contingent what corporeal they are made of: concrete and rubble concrete – 400mm masonry – 600mm brickwork above background stratum – 380 mm. The price foundation is roughly 15-20% of the appraise of the home (no national). Conversely, severe conditions are learned where the depth of freeze penetration depth of more ground urine or primer bulk grime, peat (containing big amounts of peat), silty sand, etc. They command a highly skilled feeler as the most labor-and fabric-intensive. 5 m. Done the building of pier founding, pillars were erected at all corners, intersections of wools of wood, under piers, nether heavily loaded bearings and runs at otc points of concentrated loads. The founding – introduction of the wooden house and what it is stronger, the more durable structure. The heaviness of the sand cushion is typically 30-60 cm, but should not be more than half the height of the initiation. With good geological learned wicker be applied in junction with a monumental initiation wood walls and under the classical technology of lapidate and brick.

Ваш отзыв | Comments Off