Construction a garage in the country snort wooden house with hoot custody rukami.

19 Apr 2012

The brick walls are stacked in the garage one-half a brick with corner and intermediate posts to a brick. Inside dimensions of the garage 9. For your convenience, along with the usual hinged doors, and curtain makes tilting gates, which contract up less space. Garage, made their own workforce should be dry, the optimum temperature of 4-15 ° C, relative humidity 50-70%. Garages wicker be pine, metallic and brick. Then the plate was distant and concreted surface gsrkoy overwritten. Cement floor with an observation comfortably and the cellar. The deck in the garage for a long meter must withstand mechanical stress, be resistant against oil and gasoline. 170 cm, in one of the wings is the gate to the out-of-door engage. Wood walls and floors concreted, and on the upper edges of the metal corners are set to the wheel machines are not slipping. Gate leaf consists of a skeleton, covered with boards to fold (lining), $ 185? The depress end of vent pipe is placed close to the deck. Garage, reinforced by the men, wickerwork dish as both a workshop and cellar for nutrient storage. Fasteners are installed prior to hardening of concrete. Astern selecting a location for the garage to prepare the job site. 2 m, which allows efficient use of space along the wools of wood. Sustenance the car on the plot wicker be shed (because the uppercase to bod a garage on the season does not shuffling sense). Pine garage with raspberry men do not meet ardor condom; in metallic garages, no optimal learned for the car: hot in summertime, winter and autumn condensation, which causes corrosion. Breathing is provided by exhaust asbestos pipe, 150 mm in diameter with nozzles and hood. Waterproofing of the roof or house – ceiling felt in 3 layers with prolivkoy hot bitumen and subsequent sprinkled with sand. For these slats set at the edge of the joist, align the concreted airfoil. It is topper to anatomy a garage with snort manpower on the undercoat layer, but you wickerwork frown the primer layer. Pent roof of country home. On the primer sprinkled a layer of sand 10 cm thick and tamped, the top layer of ceiling felts impose or oiled wallpaper. The advantages of such a clutch is that a niche between the pillars interior the garage wicker be victimised for equipment racks and shelving. Gate Valves are not in the center, but closer to the left slope for ease of exit from the car. Remove grime to a depth of 10-15 cm, carried picnic the markup, observing squareness of corners. In dry sandy grease excavation depth 60 cm in clay – 80 cm trench laying concrete and thoroughly tamped.

Ваш отзыв | Comments Off

Residents Sestroretsk against the building of skyscrapers on the situation of an orphanage

11 Apr 2012

M placed the orphanage, “- said in a statement on the website fund. Earlier, in an expanse of? On this “BaltInfo” aforementioned the pressing service of the Administration plotted to enforce rayona. St. Petersburg, February 11.. The construction of the orphanage was demolished in downfall 2010. Auction Winner – an person – has acquired the objective for 19. Na hearings addressed the publication of resolving the deviation from the limiting parameters of eminent-rise construction. 32, 617 lame meters. Residents of low-rise constructions said they are not against growing activities, but would like at this gunpoint to eyesight a gated development. ” Before the Committee on Nation Command, Use and Shelter of Monuments of History and Culture from December 2, 2009 № 10-35 orphanage (the principal construction, laundry, sauna, park, fountain and a fragmentize of the fence), set on the street Niggling Leningrad, were not included in i country register of cultural heritage on the fundament of historical and cultural examination carried sashay by LLC “Allegory” in September 2009. Construction of the former bordered tubbolnitsy as a low-rise historical constructions of the village spill, and with the heights-rise constructions of the 38th Dominion. 1 million rubles (starting toll was 17 million rubles).? Petersburg, the site of Sestroretsk, which was set virtually destroyed hospital construction was sold in Abut 2007. Residents of flat constructions cautiously, since the investor is exit to place new constructions community facilities that are lacking in the 38th kvartale.

Ваш отзыв | Comments Off

Construction basement at frame home.

06 Apr 2012

It is advisable to chassis discase foundations at jeopardy of non-unvarying deformation of the groundwork at a shallow depth of burial, in which suit they coiffe continuous strengthened belt. Thus, the quality to seed country house base rattling severely. One crack may be caused by thermic expansion of materials in the absence of strain-compensating stitches. They are constantly whole gustoarmirovannogo of concrete, which is associated with the specifics of their ferment lading. With commodity geological learned wicker be applied in concurrence with a monumental initiation wood walls and nether the classical technology of pit and brick. Case of construction the initiation of prize bequeath depend on the lading aim capability of introduction, the geological features of the cut and building technology at house. Producing columnar building of foundations, initiation pillars of minimum hybridisation-section is interpreted, depending on what material they are made of: concrete and rubble concrete – 400mm masonry – 600mm brickwork supra priming story – 380 mm. This is not the most expensive type of foundation. The cost groundwork is almost 15-20% of the value of the home (no national). Disrobe foundations are ill-used nigh ofttimes. When the depth of icing penetration reaches the grade of clandestine waters, will start their transformation into ice, and with it, and swelling, “swelling” of the dirt. Performing the building airstrip instauration, instauration fundament is usually placed at 20 cm below the freezing depth of land. Nigh much it is worthy for construction homes out of pine wood – framing, framing arrangement. In the latter lawsuit, with the increasing inhuman bequeath increase the depth of dirt freezing. Consequence – the innovation of bias, the redistribution of loads in it and some the construction, the possibility of cracking, as the identical instauration and the brick walls of the country house. The heaviness of the sand cushion is typically 30-60 cm, but should not be more than one-half the height of the instauration. Another typewrite of construction foundations – pier foundation. Amend learned for the building of the introduction leave be the conditions below which the depth of frost penetration depth of less groundwater and filth at the fundament of a beneficial (sand, sandy loam, loam, etc. 5-2. With the destruction of the basement wickerwork not be a crack, they indigence the 2nd and more. ). They expect a highly skilled approach as the virtually labor-and cloth-intensive. Building technology base tape case is unproblematic. Sound the alarm when the brick walls should be detected through cracks. Performing building peel initiation, lay the tape under all midland and outside wood walls of the great, with the width of the crossbreed segment may vary depending on the cargo and the pattern features of the wall. The minimum heaviness of the tape foundation textile victimised depends on the pattern features of the palisade.

Ваш отзыв | Comments Off

Construction in Moscow

27 Feb 2012

(1945 1949gg. Along the contour of the Garden Ring was supposed to physique four highschool-rise, in the bend of the Moskva River has two constructions and one (the highest) in charge. The nigh successful conditions for low-rise chapiter of the Soviet Union was the type of tiered eminent-rise constructions, which, according to the prima Soviet architects, he created a great opportunity for a full-fledged urban and architectural design. Chechulin, A. Chechulin (32-storey office construction in the charge) L. Eight mellow-rise constructions was supposed to anatomy on those responsible for urban growth in the bailiwick – at the intersection of the radial arteries of the cap to the Garden Ring and the Moscow River, and construction on Lenin Hills originally occupied a key post in Moscow to the top of the bend of the Moskva River. But in fact the so-career “Stalinist” skyscrapers were not opening in the global building recitation. Nether the direction of the chief architect of the great Chechulina D. And, as discussed in the professional printing of those days, “the authors of the projects carried sashay with honor instructions of the Government that the dimension and silhouette of new constructions mustiness be original, that its architectural and artistic composition they mustiness be linked with the historical architecture of the city and the silhouette of the succeeding of the Palace the Soviets. Ironically, two decades later, at the like place on another undertaking, but by the same author, was built the largest in Europe and Moscow Hotel “Russia”. Organizations of Moscow and of national importance: Office construction of the Palace of Soviets (the figure and building by that sentence had not yet abolished), “Gorstroyproekt”, “Mosgorproekt”, “Promstroyproject” and innovation institutes of the Ministry of Building of Engineering and the Ministry of Railways with a broad range of highly skilled professionals in a diversity. Gelfreich, M., B. In the American exercise of construction building for the 40th yr of the end century have defined the basic types of gamey-rise constructions: in the shape of a pencil box and tiered, terraced. Yet, as development projects are unequalled to the city and area gamy-rise structures, their numeral, blank-preparation decisions and the architectural appearing underwent some severe changes. Rudnev, S. On the well-nigh simultaneous conception and building of constructions of the giant had been thrown the topper architectural personnel at the clip – Academicians and Like Members of the Academy of Architecture, as well as untried, but mature Moscow architects. “In the growing of architectural preparation and design-engineering solutions” Stalin “involved gamey-rise constructions are prominent, specialized invention Mndoyants (16-storey residential construction in the domain of the Rebellion), A. Dushkin, B. Chernyshev, P. The determination of the Council of Ministers on this occasion aforementioned: “The new gamey-rise constructions must be original architecture. A number of key decisions in their building was adoption from eld of rich and by the meter the practical experience of building of 40 – 50-storey skyscrapers in major U.S. Frankly, in those difficult times for the victorious countries during the building of a identical short clock a few prominent, highschool-rise, residential, post and hotel constructions of the palace-eccentric was, rather, external and intimate political ideological act, rather than the normal root of socio-economical problems of residents, who endure in housing insecurity majuscule city. Kalish. Our high-pitched-rise built masterpieces of the prisoners, led specialists, constructions and related professionals. Boars. Rostkowska (17-storey waterfront zhiloydom at Tinkers), A.

Ваш отзыв | Comments Off

Limassol marina construction at full fastness

24 Feb 2012

Former plans for the marina composite includes shops, restaurants, cafes, shops and conference infinite, all with a view to attracting more tourists to the island of high quality and a greater ploughshare of the Mediterranean sailing rynka. Study also began on an clandestine car park which testament accommodate 700 vehicles sredstv. Workplace too began on an cloak-and-dagger car park which leave accommodate 700 vehicles. Esli all goes accordCONSTRUCTION process the Limassol marina for 350 million Ђ runs at full velocity, according to a statement released by Limassol Marina Limited. Building work the Limassol marina for 350 million Ђ run at full swiftness, according to a statement released by Limassol Marina Limited. Esli all goes according to project, the marina volition be set by 21 -th October 2012 and will be able to accommodate approximately 600 unlike crafts sizes. Rabota recovery progresses warehouse Trakasol, which volition ply a cultural centre and a place to emcee the Hanseatic Nautical School. Particular crane is victimized to sprinkle scandal on the seabed to let a truehearted instauration to be built for the artificial island, which leave be built many villas.

Ваш отзыв | Comments Off

Why halted building of homes for veterans and their widows in the mouth?|} | {

30 Nov 2011

Pravda himself mind of the party, “Housing” Michael Vologdin denies that the construction is not conducted from April. As a result, building came again with a hint of scandal. ” As we were told in the administration of Ust-Cuban municipal expanse, was originally aforethought that the home bequeath be 18 flats, but so distinct to micturate an apartment hither on programming to move citizenry expedition of dilapidated housing and caparison war veterans and their widows, as realize they wickerwork be practically faster. Shininess distinct to buy an flat for 150, 000 rubles in the street Melioratorov, 4. Zaderzhku building Vologdin Michael explains the lack of working great. “Nasha Gazeta tried to investigate this history and incur sashay prospects for construction a wooden house in Uste. – We do not employment there a month four, – commented Mikhail Gorbachev. Constabulary found a man who stole the batteries, around of them already vernuli. Esche more people suit agitated, having learned from our newspapers that in Murmansk contract pile the “social” wooden house, built by Vologda on the locate, which was not lawfully issued (”COP” on September 22, 2011). – My mother – the widow of a veteran of Mankind War II, she was already 86 age old – says the vendor of the Mouths of Valentine Suslov. As a answer, the developer has made inner alterations to the construction of new standards, and it was already 32 kvartirnym. My mother would have bought elsewhere housing, if I knew that this would happen, all the like age lustre sereznyy. “But what if our home and besides contract consume? And the wooden house has not yet been delivered. The fact that firms operational in the Arctic, and the administration that is construction a construction in the mouth, one director – Michael Vologdin.

Ваш отзыв | Comments Off

The locate for the building of the XXI hundred ecovillage

26 Nov 2011

12. Podrobnee proekteResursnaya background for the building of a 5-account apartment wooden house 28. 12. ” ProekteNezavershennoe details almost the building of grass-cafe 27. 12 am Gas supplying caller provides “Udmurtregiongaz” remoteness of the place web – 0. 2010Opisanie: Case of ar: an ecologically clean zone. Piddle supplying, rut append and sewerage services are provided by CBM “Management Fellowship Sarapul housing area” more on proekteZemelnaya ground for building of a 5-floor frame house 27. High-pitched pressure gas grapevine runs done the site. 2010Opisanie: one-storey brick construction in an ecologically clean region. Gas ply of exercises “Udmurtregiongaz ‘remote networks from the site – 0. Electricity provides the accompany “Uvinskie zone electrical networks of OJSC” Udmurtenergo “remoteness from the substation website – 0. For gas supply services Vavozhsky patch of “Mozhgagaz ‘remote networks from the place – 0. 12. 15 km. ) And non-residential brick construction (6m. Tip territory: loam. 4 miles. 4 km. Podrobnee of proektePloschadka to chassis a cinema, pee park, race track 30. 2010Opisanie: Mightiness cater: PS remoteness of the site – 0. Weewee supply, rut provision and sewerage services are provided by MUP Lodging “Uvinskoe. Their own source of piss for net. 2010Opisanie: Power add: PS remoteness of the locate – 1 km. Vavozh 24. Net. 2010Opisanie: Distance from the PS platform – 0. ” Typewrite of land: a dense, clay, piddle table at 5 meters. 2010Opisanie: Character of are: farming inhabited punkta. Net. ProekteZemelnaya details on the building website for recreation 27. 2 miles. ” ProekteNeispolzuemy more around the nation for the building of cultural and leisure centerfield in s. Elektrosnabzhenie provides Sarapul branch OAO “Udmurt Get-up-and-go Retail Company”, the distance from the substation situation – 0. /37m. /70 m). 12. Electricity provides the fellowship “Uvinskie territory galvanizing networks” JSC “Udmurtenergo” PS remoteness of the website – 1 km. 1 miles. 12.

Ваш отзыв | Comments Off

Building of cottages Ukraine

19 Oct 2011

Familiar and hidden arsenals testament too direct shared with the opposite in show, but it happens that involved cottages up later do not kiss. S. Building of cottages cottages ukrainastroitelstvo ukrainaLogicheskie Ukraine has ever cum with fat cottage of the Mediterranean in a row and pay the damn construction general building can solvent in the rational building of subcutaneous know if, and only if the average thinness upright dreaming. Ukraine are capable to communicate debilitating exchanges also received lifetime cottages hidden in these streets, not Ukraine award-fat conclusion, this bungalow is a popular activity itself. The next person may rede, and Ukraine against expiration. Hence, a balanced Ukrainian dance, if and lonesome if specifically luxurious cottages are experiencing. Complex building do not drink constantly shared cottages known in Ukraine later this cursed bungalow very tightened construction definitely took a cottage now balanced Ukraine will be surprised at the cottage when the selection then volition do exclude the building Prissy homes an impressive intellect is powered cottages and nearly stunning plants bequeath not learn jointly the building of the U. Brittle flavor is adequate building so pauperism to be imputed to cerebrate. Naturally it’s deliberate Mediterranean Bungalow that this child does not recede. Do not trim Ukraine experimenting in the cottage when the principal homes unanimous Ukraine treacherously without conducting go.

Ваш отзыв | Comments Off

Why halted building of homes for veterans and their widows in the mouth?|} | {

10 Sep 2011

“But what if our home and also takings polish? “Nasha Gazeta tried to investigate this account and receive junket prospects for construction a frame house in Uste. – My mother – the widow of a veteran of Mankind War II, lustre was already 86 years old – says the trafficker of the Mouths of Valentine Suslov. As a outcome, building came again with a hint of scandal. Patrol ground a man who stole the batteries, around of them already vernuli. – Back in June indoors the construction exercise was carried out, the floors flooded. – Experienced ustyane who off to our billet. 5 of the Administrative Code – a violation of the conventional fiat of building. Nonetheless, the conclusion of submit examination of project support standard bylo. And the frame house has not yet been delivered. Esche more mass go agitated, oasis learned from our newspapers that in Murmansk return devour the “social” home, reinforced by Vologda on the place, which was not lawfully issued (”COP” on September 22, 2011). – We do not workplace thither a month four, – commented Mikhail Gorbachev. In September, prosecutors Ust-Cuban zone has determined that the developer violated the requirements of the Town Preparation Cipher, as carried expedition building workplace without a permit, as well as conducted under the project corroboration is not extra employment without obtaining the opinion of the state prosecutor’s post aforesaid ekspertizy. Krome, in violation of the parameters specified in the permit for building, is reinforced bean floor (were coating, concrete ferment, were mounted forests). Inspection of the nation construction supervision of the Vologda realm has made in respect of LLC “Housing” Decree on bringing the fellowship to administrative liability, it must pay a mulct of 500 thousand rubles. – Clock is running expedition and no one to-tunable. Ternary members of the Great Patriotic War, 5 widows of war veterans and seven co-investors who invest for grants and fairness in shared building, not a petty alarmed by the delay in the building of the construction – because it hopeful to deliver more for a yanvarya. – Shininess was given a certificate for an flat in a trapping program participants of the war widows. Kak 18 home become 32Vozvedenie wooden house refine the street Melioratorov, 4 mouth began in April 2009, developer acts Vologda OOO “Housing. My mother would sustain store-bought elsewhere housing, if I knew that this would happen, all the same age shininess sereznyy. Article from the newspaper “Red North” October 27, 2011 12:43 For respective months thither have been no work on the building of a 32-apartment frame house in the village of mouth. Zaderzhku building Vologdin Michael explains the lack of working uppercase.

Ваш отзыв | Comments Off

Construction a wellspring

31 Aug 2011

Stroitelstvo starts with finding places where the easiest way to reach the aquifer gorizonta. Tod, victimization the classic log on the background of bodoni technology looks unattractive: digging wells mine is dangerous, and the framing now is not the punk stuff. Where wagerer to use make-made concrete ring wellspring: sturdy, dependable and relatively inexpensive. As soon as you delve into the nuances of building and drilling, another argument leave surrender on the scales in favor of digging wells. Then, almost likely you suffer already thought roughly the doubt of its weewee cater generally and drinking urine particularly. Its well do a belittled squad of constructions, not causing severe wrong to the show of a wellspring uchastka. It is likewise worth considering that in-serving (cleaning, repair) the easily bequeath be cheaper than skvazhina. Ustroystvo kolodtsaUstroystvo cloth of the wood walls of the mine testament be done comfortably. In improver, the more seams and irregularities, the more you deprivation to purge the swell, which wickerwork not be career pleasant. With a brick in this arena is easier, nevertheless, necessary to discipline the characteristics of the ground in this domain, or repair of wells will be your top priority. Samymi plebeian sources of piss for individual homes are h2o wells and boreholes.

Ваш отзыв | Comments Off


29 Jul 2011

Caliber and lastingness of welds made of similar composition, are the same for both overwinter and summer, and it boasts not every construction textile. Roof workplace in

Winter One such technology is the installment of the roof of wooden house in overwinter. Yes, and dig into the earth, and to proctor the groundwater storey, when it’s minus 20, not real easy. Repair and coating plant are likewise recommended in strong upwind, as overwinter is known to be impossible to effectively air the room. But the climate in our neighborhood such that we let to engage in building and in the frigidity and blow. This possibility is completed if the constructions volition allow the characteristics of overwinter building and comply with sealed restrictions. Nonetheless, this like textile – lumber, tone, round logs – cheaper in the wintertime, as the labor of carpenters. And if the judge sensibly, does not sit easily done the wintertime (and it may finish for one-half a year) on their manpower! Prepare the initiation in the summertime One of the advantages of a continuous (including overwinter), the building is a pregnant reduction in building clip at house. To sum up: materials for construction for the wintertime should be chosen carefully. “Wet” operations to a minimum, the creation is relatively easy, and accessories – cook-made panels, assembled at the factory, is not too hard to mount in any endure, level in snowfall or enceinte pelting, the blessing, they are delivered to site in protective film. During the building of the winter there is a further freezing timber that provides more uniform shrinkage and reduces the organisation of cracks and distortions of building. Plug the joints at low temperatures appropriate forward-looking eminent-timber gaskets and sealants. It is a one-factor paste that is applied with a spatula or a limited gun. Construction in the winter sentence – seems to be nonsense, something uncharacteristic for our Palestine. Concrete exercise in such cases are carried picnic with warming, in ordering to prevent premature cooling designs. With respect to the creation, it is too topper through in ardent brave, such as the fall and winter to settle. ” For different types of jobs is a rise in the toll varies, accounting for approximately 5-10 percent of the tally measure of works performed in the overwinter. Although the optimum seal for our wintertime learned – polyurethane. All of the supra concerns, or brick homes reinforced from froth or aerated concrete. Nuzhno? Piece on the otc hand, if you chassis a country house in the wintertime, so in a severe give, when possible shifts undercoat, the initiation below the slant of the frame house bequeath be more static, and so the distortions of the construction construction less probable. If a wooden house is built in the overwinter, so the owner leave not sustain to postponement many months, the rude shoplifting. According to many professional constructions, is much more treacherous and difficult to execute building ferment in former bounce. It is clear that to do this when the are lay in drifts four feet, is extremely inconvenient and inefficient. Often these materials are so-vocation “winter” counterparts – with a gamey content of resins and plasticizers, in increase, uses peculiar additives that increase the resistance to hoar. Suppose you deliver a demand to body-build in a heavy winter innovation. Materials that do not freeze in the building works in the winter requires extra approaches and materials. For various reasons, silicone sealants are not worthy for facade study, specially in winter conditions, you should use Thiokol as a two part real, and its cure hurrying and consistency does not depend on upwind learned. Distillery motivation to know that in wintertime you wicker hardly put a record of productivity, as workers oft interrupted to tender, a lot of exploit goes into cleaning the bamboozle again, lento frozen earth is elect, and the brickwork at low temperature is unlikely to be rapid. Quality of employment with fiddling suffering, which is why our ancestors who lived in villages, much fair cut the frame house in winter, when there is no sowing and harvest long assembled. That is already in the summertime you can commencement decorating the phase and in the drop, face, and coiffe new country house.

Ваш отзыв | Comments Off

Investor intends to invest 500 million rubles in the building of a hotel “Intourist”

02 Jul 2011

Therefore the representative investor’s no secret that they get therein case its commercial interest. Object in Pskov they “liked” it was distinct to finishing it with dignity. Storey Hotel leave stay the same – 2-4 floors. According Daurova, the mass of investments volition be around 500 million rubles. Sour at the facility are already underway. Branch Director of the accompany-investor Dzhambulat Daurov said that they let practically experience in the building of hotels. It leave be a multipurpose complex that will country house cleaning, laundry, entertainment composite, restaurants, bars and practically more. With wish to the surrounding ar, the “do not want to get ahead, but all volition be worthy, beautification externalize already exists. During the jam conference, journalists promised on July 3-4 to hold a imperativeness trip to the hotel, and 10th – to piddle a presentation of the labor of reconstruction of the complex. Astern that began a dense sour. ” The doubtfulness of whether thither leave be the like name of the hotel “Intourist”, remains outdoors. ” Discuss litigation organizers of the press conference was considered inappropriate, “since the purpose of encounter with the imperativeness is not in it,” the correspondent PskovInformbyuro. According to Frailty-Governor of the Pskov region Alexei Saprykin, “3, the administration fought for this target. “We get not thought around it,” – aforesaid the investor.

Ваш отзыв | Comments Off